Feature overview
Stages give you one place to see the status of every task in a project and how much of the work is done. You set up the steps of your workflow, such as PRD, Design, or QA, and start tasks in them as work begins. Each stage has two sections: In Progress for work that is underway and Done for work that is finished, so the status of the whole project is visible across the stages. You find Stages in the Stages tab in the project’s top navigation. The project’s tasks are listed on the left. To put a task into a stage, select the task, then click Start in that stage. The task’s name appears in the stage’s In Progress section. When the work is finished, mark the task as done, and it moves to the stage’s Done section, which is collapsed by default so you don’t have to keep looking at finished work. Adding a task to a stage doesn’t change the task, and the task stays in the list on the left. A task can be in more than one stage at the same time, and you can select several tasks and start them in different stages at once. Here is one example. This project uses two stages, Design and QA, but you can set up stages fit your own workflow.When to use Stages
1. Track work through the steps of a workflow
Use stages when your work passes through more than one step and you want to see what is underway at each step.- Project tracking: A project manager creates PRD, Design, and Build stages to match the phases of a project. As work on each task begins in a phase, the project manager starts the task in that stage. At any point, the project manager can open the Stages tab and see which tasks are in progress in PRD, which are in Design, and which are in Build.
- Content production: A marketing lead creates Draft, Review, and Publish stages for a campaign project. Each piece of content is started in Draft, then in Review when it is ready for feedback. The Review stage shows only the content that is being reviewed now.
2. Run a task through several steps at once
Use stages when a task needs more than one step to happen at the same time.- Parallel work: An engineer’s task needs both Build and Test to run side by side. Starting the task in both stages puts it in the In Progress section of each, and it moves to the Done section of each stage as that step is finished.
- Sign-offs: A project manager has a launch announcement that needs both Legal Review and Brand Review. The project manager starts the task in both stages, so it shows in the In Progress section of each. Legal can finish its review and move the task to its Done section while Brand Review is still in progress.
How to use Stages
Open Stages
Open a project and click the Stages tab in the top navigation. The project’s tasks are listed on the left.Create a stage
Anyone can create stages in a project.- Open the Stages tab.
- Click +Add Stage.
Change the order of stages
You can move a stage left or right to change where it sits among the other stages. For example, if you created Design before PRD, you can move Design so that it comes after PRD.Start a task in a stage
- In the Stages tab, select a task in the list on the left.
- In the stage you want, click Start.